Processing Equipment: What You Can't Get Away With

Did this ever happen to you?

The schedule today reflects 20 GI scopings. There is only 20 minutes time scheduled between patients. There simply is not enough time to get everything done!

Since the scopes have to be sterilized or high-level disinfected for a specific period of time, the cleaning time will have to be shortened. What else can one do?